Execute: Implement from Plan
Plan to Execute
Read plan file
Execution Instructions
1. Read and Understand
- Read the ENTIRE plan carefully
- Understand all tasks and their dependencies
- Note the validation commands to run
- Review the testing strategy
2. Create a New Branch
- Create a descriptive branch name based on the feature or fix being implemented
- Switch to the new branch before making any changes
3. Execute Tasks in Order
For EACH task in "Step by Step Tasks":
a. Navigate to the task
- Identify the file and action required
- Read existing related files if modifying
b. Implement the task
- Follow the detailed specifications exactly
- Maintain consistency with existing code patterns
- Include proper type hints and documentation
- Add structured logging where appropriate
c. Verify as you go
- After each file change, check syntax
- Ensure imports are correct
- Verify types are properly defined
4. Implement Testing Strategy
After completing implementation tasks:
- Create all test files specified in the plan
- Implement all test cases mentioned
- Follow the testing approach outlined
- Ensure tests cover edge cases
5. Run Validation Commands
Execute ALL validation commands from the plan in order:
# Run each command exactly as specified in plan
If any command fails:
- Fix the issue
- Re-run the command
- Continue only when it passes
6. Final Verification
Before completing:
- ✅ All tasks from plan completed
- ✅ All tests created and passing
- ✅ All validation commands pass
- ✅ Code follows project conventions
- ✅ Documentation added/updated as needed
Output Report
Provide summary:
Completed Tasks
- List of all tasks completed
- Files created (with paths)
- Files modified (with paths)
Tests Added
- Test files created
- Test cases implemented
- Test results
Validation Results
# Output from each validation command
Ready for Commit
- Confirm all changes are complete
- Confirm all validations pass
- Ready for
/commitcommand
Notes
- If you encounter issues not addressed in the plan, document them
- If you need to deviate from the plan, explain why
- If tests fail, fix implementation until they pass
- Don't skip validation steps